Contract CR103 Design and Construction of Aviation Park Station and Tunnels
|
Land Transport Authority Singapore
|
S$320
|
9 Nov 2021 - 31 Dec 2029
|
Contract URA/T/21/014R Design Development and Construction of the Proposed Infrastructure Works at Lorong Chuan Area
|
Urban Redevelopment Authority
|
S$14.5
|
(Phase 1) 30 Dec 2021 - 30 Jun 2023
(Phase 2) 30 Dec 2021 - 29 Dec 2024
|
Contract CR113 Design and Construction of Serangoon North Station and Tunnels
|
Land Transport Authority Singapore
|
S$454
|
11 Jan 2022 - 31 Dec 2029
|
Proposed Erection of Warehouse Development at Tampines Industrial Drive (Plot 2)
|
Hock Lian Seng Infrastructure Pte Ltd
|
S$8.4
|
Mar 2017 - Sep 2018
|
Proposed Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport – Package Two (60% JV)
|
Changi Airport Group (Singapore) Pte Ltd
|
S$1,107
|
Aug 2016 - 2020s
|
Proposed Erection of A 6-Storey Multiple-User Ramp Up General industrial Factory ( 174 Units) Development with A 1 Temporary Industrial Canteen And 4 Shops (Minimart) On Lot 04844K, MK 07 At 11 Tuas South Link 1 (Tuas Planning Area)
|
Beacon Properties Pte Ltd
|
S$70
|
Jan 2016 - Aug 2018
|
Contract 9061 Design and Construction of Stabling at Gali Batu Depot
|
Land Transport Authority Singapore
|
S$137.4
|
Jan 2015 - Nov 2019
|
Contract T223 Construction of Maxwell Station for Thomson-East Coast line
|
Land Transport Authority Singapore
|
S$221.8
|
Apr 2014 - Dec 2020
|
Contract ED/T4/2013/10 Proposed Development of Taxiways, Aircraft Parking Stands and Other Associated Works At Former South End Reservoir Site
|
Changi Airport Group (Singapore) Pte Ltd
|
S$105
|
Jan 2014 - Sep 2018
|
Development at Kaki Bukit Proposed Erection of a Multiple User General Industrial Development at Kaki Bukit Avenue 6
|
Hock Lian Seng Properties Pte Ltd
|
S$26
|
Oct 2012 - Dec 2014
|
Development at Gambas Proposed Erection of a 9 Storey Multiple user Light Industrial Development at Gambas Avenue
|
HLS Development Pte Ltd
|
S$70
|
Nov 2012 - Nov 2014
|
*Contract 911 Design and Construction of Depot for Downtown Line
|
Land Transport Authority Singapore
|
S$410
|
Mar 2009 - Jul 2015
|
Contract 481 Design, Construction And Completion of Marina Coastal Expressway (Marina Wharf)
|
Land Transport Authority Singapore
|
S$305
|
Jan 2009 - Jun 2014
|
Contract 901 Construction And Completion of Marina Bay Station Including Associated Tunnels for Downtown Line Stage 1
|
Land Transport Authority Singapore
|
S$348.4
|
2012
|
Supply of Building Materials for the HDB
|
Housing & Development Board
|
S$7.7
|
2011
|