Infrastructure Engineering Services
Designing and deploying a complete range of civil and infrastructure engineering solutions involve effective and streamlined coordination to enable a smooth work flow which have seen success in all our mega projects, such as highways, bridges, wharves, sewerage treatment plants and MRT stations. As always, our technical consultants are on-hand to oversee the running of various projects from start to finish.
Types Of Infrastructure Services
Roadwork Construction
As one of the prominent roadwork contractors in Singapore, we have garnered numerous Construction Excellence Awards from the Building and Construction Authority.
Some of HLS’ award-winning projects include
2006
|
Bridge Across Jurong River
|
2003
|
Upgrading of Telok Blangah Road to semi-expressway (from Kampong Bahru Road to Henderson Road) in 1998, the largest project ever awarded by LTA Road Construction Department at that time
|
1995
|
Kranji Expressway / Bukit Timah Expressway Interchange
|
1989
|
Tampines Expressway / Tampines Avenue 10 Interchange Projects; Loyang Avenue 7 / TPE vehicular bridge and roadwork
|
Mass Rapid Transit System (MRT)
HLS has more than 20 years experience including numerous successful ventures in MRT construction works. We also had the honour of being invited by Taipei Metropolitan Area Rapid Transit Systems (Taiwan) to provide technical consultant services for the construction of two MRT stations in Taipei. Below are some of the other MRT projects we have undertaken:
-
Construction of viaducts and tunnels for Bukit Batok, Bukit Panjang, Chua Chu Kang and Boon Lay MRT Stations under Phase Two of the east-west MRT line, Taipei Metropolitan Area Rapid Transit Systems, Nankang Line Contract 255 Station BL 10 and BL 11 and line section with pedestrian Mall
-
Joint venture with a reputable international construction company for the design, construction and completion of Sengkang, Buangkok and Punggol MRT stations, including tunnels.
-
Construction of an underground MRT depot situated at Kim Chuan Road spanning between Hougang Ave 3 and Paya Lebar Road with 3 levels RC structure in Circle Line (CCL), consisting of piling, architectural, civil and building services works and a stretch of vehicular flyover above depot forming part of Bartley Extension project. The site area is about 127,000 m2.
-
Construction of Marina Bay Station including Associated Tunnel and Downtown Line Stage 1
Marine Engineering
Marine Engineering is another field we specialise in.
Having ventured into this field in 1989, our completed marine works so far include
1995
|
Construction of overhead bridge crane structures for new container terminal at Pasir Panjang in collaboration with Mitsui Engineering & Shipbuilding Co., Ltd
|
1992
|
Expansion of the eastern and western parts of Pasir Panjang deep water wharves
|
Airport Projects
HLS has maintained a very close working relationship with Civil Aviation Authority of Singapore (CAAS) for the past 20 years and has completed the following projects:-
2007
|
Completed the construction of Changi Airport Terminal 3 Aircraft Parking Aprons with an approximated contract sum of $54 million
|
1999
|
Awarded a similar project for the expansion of Changi Airport Terminal 1 with a contract sum of $52.3 million
|
1995
|
Completed the construction of the Aircraft Parking Aprons, Associated Taxiways and Ancillary Works for phase 1 of the expansion of Changi Airport Terminal 2 with a contract sum of $48.3 million
|
Other Infrastructure Works
HLS has also been actively involved in a number of drainage and sewer system as well as water treatment works including:
- Seletar Sewerage Treatment Works
- Bedok Raw Water Pumping Station
- Redevelopment of Singapore River